28 Dec 2020 |
Term Contract for the Conservancy and Cleaning Works for Toa Payoh West-Thomson Estate for the Period 1 April 2021 to 31 March 2024
|
Closed |
|
28 Dec 2020 |
Term Contract for the Conservancy and Cleaning Works for Shunfu and Sin Ming Estate for the Period 1 April 2021 to 31 March 2024
|
Closed |
|
28 Dec 2020 |
Term Contract for the Conservancy and Cleaning Works for Toa Payoh Central Estate for the Period 1 April 2021 to 31 March 2024
|
Closed |
|
28 Dec 2020 |
Term Contract for the Conservancy and Cleaning Works for Toa Payoh East Estate for the Period 1 April 2021 to 31 March 2024
|
Closed |
|
18 Dec 2020 |
Term Contract for the Maintenance of Booster/Transfer Pumps and Refuse Chute Flushing System for the period 1 April 2021 to 31 March 2024
|
Closed |
|
18 Dec 2020 |
Term Contract for the Maintenance of Mechanical Roller Shutters for the period 1 April 2021 to 31 March 2024
|
Closed |
|
18 Dec 2020 |
Term Contract for the Provision of Lift Testing, Parts Certification and Engineering Services for the period 1 April 2021 to 31 March 2024
|
Closed |
|
18 Dec 2020 |
Construction of Covered Shelter over Existing BFA Ramp near Block 275A Bishan St 24
|
Closed |
|
18 Dec 2020 |
Upgrading of Children Playground at Bishan-Toa Payoh Town Council Estates
|
Closed |
|
06 Nov 2020 |
Neighbourhood Renewal Programme (Batch 10) At Block 80, 80A, 80B, 81, 81A, 81B, 82, 82A, 82B, 84, 84A, 84B, 86, 81C (MSCP) And 84C (MSCP) At Lorong 2 And 4 Toa Payoh
|
Closed |
|
16 Oct 2020 |
Replacement Of Booster Pumpsets To 59 Blocks And Fire Pumpsets To 19 Blocks For Water Distribution And Fire Protection System
|
Closed |
|
11 Sep 2020 |
Proposed Construction of Covered Linkway across Traffic Junction between Blocks 281 and 288 Bishan Street 24
|
Closed |
|
11 Sep 2020 |
Inspection and Modification of Rooftop Water Tank Overflow Pipes at HDB Blocks for Bishan-Toa Payoh Town Council
|
Closed |
|
17 Jul 2020 |
Construction Of Linkway Connecting From Thomson Community Centre To Shunfu Estate At Shunfu Road
|
Closed |
|
26 Jun 2020 |
Term Contract For Safety Inspection, Servicing And Maintenance Of Children Playgrounds And Fitness Equipment For The Period 1 September 2020 To 31 August 2023
|
Closed |
|
19 Jun 2020 |
Replacement of Water Pipes for 15 Blocks at Blk 80, 80A, 80B, 81, 81A, 81B, 82, 82A, 82B, 84, 84A, 84B, 86, 171 & 172 Lorong 1/2/4 Toa Payoh
|
Closed |
|
19 Jun 2020 |
Replacement of Stainless Steel Water Tank High Density Polyethylene (HDPE) Liners & Tank Covers and Solenoid Operated Pilot Valves to 33 Blocks at Blk 182 to 191 Bishan Street 13, Blk 301, 303 to 305, 307 to 310, 312 & 313 Shunfu Road, Blk 401 to 408 Sin Ming Avenue & Blk 236 to 240 Lorong 1 Toa Payoh and Replacement of Fibre-Reinforced Plastic (FRP) Water Tanks to 2 Blocks at Blk 69 & 73 Lorong 4 Toa Payoh
|
Closed |
|
27 Mar 2020 |
Provision Of Fixed Awning, Upgrading Of Existing Covered Linkway, Pavilion And Barbeque Pits At Bishan-Toa Payoh Town Council Estates
|
Closed |
|
27 Mar 2020 |
Upgrading of Basketball Court and Soccer Field Fencing at Bishan-Toa Payoh Town Council Estates
|
Closed |
|